Request Test Drive

Details & Equipment

  • Body Style
    SUV
  • Paint Colour
    Onyx
  • Main Hide Colour
    Beluga
  • Registration Date
    23.09.2021
  • Mileage
    34,525 miles
  • Transmission
    Automatic
  • Power
    542 bhp
  • VIN
    SJAA514V6MC038856
  • CO2 Emissions
    272 g/km

Clock
  • Bentayga Clock
Comfort and Convenience
  • Adaptive Cruise Control
  • Ambient Mood Lighting
  • Electrically Adjustable Lumbar Support to Front Seats
  • Electrically Operated Bootlid
  • Electrically Operated Exterior Mirrors with Heating, Folding, Auto Dimming and Memory Function
  • Electronic Air Conditioning
  • Follow-me-home Lighting
  • Heated, Acoustic, Heat-insulating Windscreen
  • Heated Front and Rear Seats
  • Heated Rear Bench Seat
  • Keyless Entry
  • Panoramic Glass Sunroof
  • Park Assist
  • Rake and Reach Adjustable Steering Column
  • Rear Privacy Glazing
  • Soft Close Doors
  • Ventilated Rear Bench Seat
Equipment
  • 22-way Electrically Adjustable Front Seats with Memory Function
Exterior Colours
  • Main Paint - Onyx
Exterior Design
  • Black Roof Rails
  • Gloss Black Exhaust Finishers
  • Jewel Fuel Filler Cap
  • Jewel Oil Filler Cap
In-Car Technology
  • Battery Charger
  • Bentley Signature Audio System
  • Bluetooth Telephone Connectivity with Wireless Charging Pad and External Antenna
  • Connect Package
  • Digital Dashboard Display
  • Digital Radio
  • Heads Up Display
  • Integrated Garage and Gate Opening Controls
  • Navigation System
  • Online Services
  • Traffic Assist
  • Traffic Sign Recognition
Interior Colours
  • Accent - Matched to Main Hide
  • Boot Carpet - Beluga
  • Carbon Fibre - Black
  • Carpets - Matched to Secondary Hide
  • Contrast Stitching - Hotspur
  • Emblem Stitching - Hotspur
  • Interior Colour Split - D
  • Main Hide - Beluga
  • Secondary Hide - Beluga
Interior Design
  • Contrast Stitching
  • Embroidered Bentley Emblems
  • Embroidered Emblems
Interior Finishes
  • Carbon Fibre Fascia, Centre Console and Door Waistrails
  • Carbon Fibre Fascia Panels, Centre Console and Door Waistrails
  • Diamond Quilted Hide Seats
Lighting
  • Auto Headlights with Dynamic Range Adjustment
  • High Beam Assist
  • LED Matrix Headlights
  • Puddle Lighting in Doors
Mulliner
  • Mulliner Driving Specification for Black Specification
Safety and Security
  • Anti-theft Alarm System
  • Bentley GPS Tracking System with Anti-theft Alarm System
  • Bentley Safeguard Rear
  • Blind Spot Assist and Exit Warning
  • Child Seat Anchor Points
  • City Safeguard
  • Driver and Front Passenger Airbags with Passenger Airbag Deactivation
  • Driver Assistance System
  • Electronic Parking Brake with Hill Hold
  • Emergency and Roadside Assistance Call Service
  • Front and Rear Side and Curtain Airbags
  • Lane Assist System
  • Night Vision
  • Pedestrian Protection
  • Top View Camera
  • Tyre Pressure Monitoring System
Specification
  • Blackline Specification
  • Black Specification
  • Colour Specification
  • Comfort Specification
  • Long Wheelbase
  • Styling Specification
  • Touring Specification
Steering Wheel
  • 3-spoke, Heated, Single Tone, Hide Trimmed Steering Wheel
Vehicle Dynamics
  • 4 Corner Air Suspension with Electronic Shock Absorption Control
  • 85 Litre Fuel Tank
  • Automatic Slip Control Differential
  • Bentley Dynamic Ride
  • Bentley Dynamic Ride
  • Drive Dynamics Modes
  • Emissions Concept - EU6 AP
  • Power Steering
  • Sports Pedals
Wheels and Brakes
  • 22" 5-spoke, Directional, Black Painted Alloy Wheels
  • 22" 5-spoke, Directional, Black Painted Alloy Wheels
  • Bentley Wheel Badges
  • Red Painted Brake Callipers
  • Red Painted Brake Callipers

CERTIFIED BY BENTLEY

With a Certified by Bentley pre-owned car, your future looks extraordinary. Purchasing a pre-owned Bentley marks your entry into an exclusive world that few get to experience – one built on a century of unrivalled craftsmanship and breathtaking performance, driven by a community of like-minded and inspirational Bentley owners.

Choose a Certified by Bentley pre-owned model for a range of exclusive benefits including a 12 month warranty. Find out more about the benefits of Certified by Bentley and explore our full range by getting in touch on 0117 203 3950 or by visiting Bentley Bristol in person.

Contact dealer

Bentley Bentayga V8
Bentley Bristol, VIN: SJAA514V6MC038856, Onyx, GBP109,895, 23.09.2021

* Mandatory fields

Please fill in your details below and we will call you back shortly to assist with your enquiry.

Marketing Preferences
To ensure you are kept up to date with Bentley news and product and service information, please provide your contact preferences below. Communications from Bentley will include: exclusive Bentley news, product information, brand stories, invitations to one-of-a-kind events, communications relating to Bentley ownership and market research to support us in developing the future of Bentley.

I would like to receive marketing communications from Bentley via: